<em id="hh3zj"><form id="hh3zj"><nobr id="hh3zj"></nobr></form></em>

          WELCOME TO SHANDONG DAZHONG MECHANICAL MANUFACTURING CO., LTD. HOME
         
        Sprocket
        Front Idler
        Roller
        Supporting wheel
        Cutting & End Bit
        Front Fork & Tooth
        DETAIL    
        Ten indexes of Management

        One goal: achieve profit
        Two foundations: Make budget and Target
        Three Flow: HR flow, Material flow and information flow
        Four ations: Assemblization, Stabilization, Standardization, Diversification.
        Five Improving Factors: Worker, Machine, Material, Method, Producing
        Six indexes: Producing capacity, Quality, Cost, Delivery, Safety, Morale
        Seven Wastes In:
        Producing, Transportation, Processing, Movement, Stock, Failure products, Waiting
        Eight Lost in:
        Breakdown time, Changing Moulds , Changing Knife , Machine warming, Lower speed, Bad changing, SD
        Nine Managements
        Raw material and semi finished products.
        Machine maintenance
        Volume, Quantity, position
        TPS
        SPC
        FMEA
        Walking Management
        Visual Management
        Scene Management
        Ten Action Shoulds:
        Prepared
        Fast
        Careful
        Organized
        Understand
        Positive
        Courage
        Briefly
        Improving
        Reporting

        Copyright ? 2018- SHANDONG DAZHONG MECHANICAL MANUFACTURING CO., LTD. Website:www.shannasharp.com
        国产A亚洲A欧美A_国产a在亚洲线播放_国产BT在线